Enoura Tunnel (formerly nagashima Tunnel)
These are the three brick tunnels located on the north side of the six tunnels constructed as part of the Kumano Kaido (currently National Highway No. 42) renovation project that continued for 20 years starting in 1909. . The northernmost tunnel is Enoura Tunnel (formerly nagashima Tunnel), followed by Furusato Pedestrian Tunnel (formerly kaino Tunnel) and Michise Pedestrian Tunnel (formerly Michise Tunnel) to the south. It was designed by Totaro Iwai, a prefectural engineer, and directed by Hisashi Amano, a prefectural engineer. The upper part is shaped like a semicircle with a shield-shaped stone...
HigashiKishu
Kihoku Town, KihokuTown